Flowserve 1878 Y-Pattern Globe Valves Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Sprzęt komputerowy Flowserve 1878 Y-Pattern Globe Valves. Flowserve 1878 Y-Pattern Globe Valves User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 17
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Manual No. 1878-YGB-BL-1
Issued: November 26, 2002
Revision B
INSTRUCTION MANUAL
for
½" thru 2" 1878 lb. Y-Pattern Globe Valves
with T-Handle and Bellows Seal
Flowserve Corporation
Flow Control Division
1900 S. Saunders Street
P.O. Box 1961
Raleigh, NC 27603
Phone: (919) 832-0525
FAX: (919) 831-3369
Przeglądanie stron 0
1 2 3 4 5 6 ... 16 17

Podsumowanie treści

Strona 1

Manual No. 1878-YGB-BL-1 Issued: November 26, 2002 Revision B INSTRUCTION MANUAL for ½" thru 2" 1878 lb. Y-Pattern Globe Valv

Strona 2

9.0 MAINTENANCE INSTRUCTIONS (Continued) (15) At this time, the disc and seat ring may be lapped if required. The seating surface should be

Strona 3 - “110A” with “110”

9.0 MAINTENANCE INSTRUCTIONS (Continued) 9.2 REPLACEMENT OF PACKING (Refer to Figure 1 for reference part numbers) (1) Remove the two Gland

Strona 4

9.0 MAINTENANCE INSTRUCTIONS (Continued) 9.3 REFINISHING SEALING SURFACES Minor discontinuities in the seat sealing surface, which may cause l

Strona 5

9.0 MAINTENANCE INSTRUCTIONS (Continued) 9.4 TROUBLESHOOTING A. Excessive Tee-Handle (175) Effort or Binding Excessive tee-handle effort or

Strona 6

10.0 STORAGE REQUIREMENTS The valves have been shipped in the closed position. Upon receipt of the valves at destination, the crates should be exa

Strona 7

SECTION 11.0 REFERENCE DRAWING(S) 15

Strona 8

FIGURE 1: 16

Strona 9

SECTION 12.0 CUSTOMER ASSEMBLY DRAWING(S) 17

Strona 10

TABLE OF CONTENTS 1.0 Physical Description and Operation of Equipment 2.0 Design Conditions 3.0 Operating Conditions 4.0 Test Conditions

Strona 11

Manual No. 1878-YGB-BL-1 REVISION RECORD Revision Section Description Date - All Original Issue 11/26/2002 A 9.1.2

Strona 12

1.0 PHYSICAL DESCRIPTION AND OPERATION OF EQUIPMENT 1.1 GLOBE VALVES (Figure 1) These valves are primarily designed for tight shutoff and thro

Strona 13

4.0 TEST CONDITIONS 4.1 Each valve covered by this manual has received the following hydrostatic tests: 4.1.1 Shell hydrostatic test at 1.5 ti

Strona 14

6.0 INSTALLATION INSTRUCTIONS (Continued) 6.2.3 Where possible, install the valves with the stem vertical. 6.2.4 The valves should then be bloc

Strona 15 - REFERENCE DRAWING(S)

7.0 MAINTENANCE REQUIREMENTS 7.1 PREVENTATIVE MAINTENANCE 7.1.1 Check all nuts and bolts periodically to ensure tightness and to forestall po

Strona 16 - FIGURE 1:

9.0 MAINTENANCE INSTRUCTIONS 9.1 DISASSEMBLY and REASSEMBLY The following instructions cover the disassembly and reassembly of the ½”-2” Y- Gl

Strona 17 - CUSTOMER ASSEMBLY DRAWING(S)

9.0 MAINTENANCE INSTRUCTIONS (Continued) (9) Loosen the Stem Clamp Setscrews (221) and remove the Stem Clamp (029) and Stem Clamp Key (255).

Komentarze do niniejszej Instrukcji

Brak uwag