Flowserve XLC Series Instrukcja Użytkownika Strona 3

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 8
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 2
3
1.7 Checkmountingplateboltholesandboltcircletoensuretheyarethe
sameasshownontheassemblydrawing.
1.8 Inspectindividualbearingcomponentsforanysignicantnotches,
scratches,ordings.Thewiperseals,WR600insert,andsphericalsur-
facesofthemetalliccomponentsshouldbekeptcleanandfreeofdebris.
1.9 HandletheXLCbearingwithcare;itismanufacturedtoprecisetoler-
ances.Thebearingsurfacesareofspecialimportanceandshouldbekept
perfectlycleanatalltimes.
1.10 Toolsneededforinstallation:Anopen-endwrenchandtorquewrench
sizedfortheglandboltnuts,aatheadscrewdriver,andhexhead
wrenchessizedforthebearinghousingandcarriercapscrews.
2 XLC Bearing Installation
2.1 TheXLCbearingwillcomefromthefactorypartiallyassembledwithout
thewipersealsandO-ringsinstalled.Partiallydisassemblethebearingfor
installation.
2.1.1 Unboltthehalvesofthe
housingandsetasidethe
capscrewsforfutureusein
assembly.
2.1.2Unboltthehalvesofthe
carrierassemblyandset
asidethecapscrewsfor
future use in assembly.
2.2 JoinoneballandsocketO-ring
aroundtheshaft.
2.2.1 Donotattempttodisconnect
theO-ring.Thiswilldestroy
thelockingfeatureandmake
theO-ringunusable.
2.3 Placeupperwiperjacketaround
shaftsotheanti-rotationtabpoints
up.InsertballandsocketO-ringinto
wiperjacketcavityfrombelow.
2.3.1 Repeatstep2.2.Place
lowerwiperjacketaround
shaftsotheanti-rotationtab
pointsdown.Insertballand
socketO-ringintowiper
jacketcavityfromabove.
Przeglądanie stron 2
1 2 3 4 5 6 7 8

Komentarze do niniejszej Instrukcji

Brak uwag