Flowserve CB 1 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Sprzęt komputerowy Flowserve CB 1. Flowserve CB 1 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - GESTRA Steam Systems

1CB 1...CB 2...Installation Instructions 810707-02Swing Flap Non-Return ValvesCB 1..., CB 2...GESTRA Steam SystemsGESTRA

Strona 2 - Contents

10FunctionScope of supplyExplanatory NotesCB 141 Swing flap non-return valve CB 141 Installation manualCB 24 S1 Swing flap non-return valve CB 24 S1 I

Strona 3

11Pressure/Temperature Ratings*) CB 26, steel down to –10°C at nominal pressureDN 50– 200Temperature [°C] 20 100 150 200 250 300 350 PNPressure DN 50

Strona 4

12Explanatory Notes – continued –Name Plate / MarkingDirection of flowSpecification impressed on valve body: CB 14, DN 50-80 to EN 19Fig. 5Size Nomi

Strona 5

13InstallationNoteCB 1..., CB 2...1. Observe installation instructions on page 14.2. Clean seating surfaces.3. Installation in horizontal lines: Inser

Strona 6 - Pressure Drop Chart CB 1

14Installation – continued –Fig. 13Fig. 14Fig. 16incorrect correctoptimum with pumpFig. 15

Strona 7 - Pressure Drop Chart CB 2

15OperationCB 1..., CB 2...CB 1..., CB 2...CommissioningUnfavourably or incorrectly positioned swing flap non-return valves will lead to loud clatteri

Strona 8 - Important Notes

16Maintenance – continued –CB 2... Replace springs / O-ringNote that springs are preloaded which means that they can jump out of the valve bodywhen t

Strona 9 - Category IIIIIIIV

17Maintenance – continued –CB 2... Replace springs / O-ring – continued –Tools Combination pliers 180 mm, DIN 5244 Aligning punch, 80 mmInsert lef

Strona 10 - Explanatory Notes

18ItemDNTwo springs are required per valve. Contact your local dealer for small quantities.No spare parts available for CB 14.Stock codeO-ring NBRSpri

Strona 11 - – continued –

19ItemDNTwo springs are required per valve. Contact your local dealer for small quantities.No spare parts available for CB 14.Stock codeO-ring NBRSpri

Strona 12 - (e. g. “02” = 2002)

2ContentsUsage for the intended purpose ... 8

Strona 13 - Installation

20We hereby declare that the pressure equipment CB 1... and CB 2... conform to the following EuropeanDirective: EC Pressure Equipment Directive (PED)

Strona 15 - Operation

22For your notes

Strona 17

24Great BritainItaliaEspañaUSAPortugalPolandAgencies all over the worldwww.gestra.de810707-02/604cm · © 2001 GESTRA AG · Bremen · Printed in GermanyGE

Strona 18 - Spare Parts

3Parts Drawing CB 1...Fig. 1ABDGE

Strona 19 - Spare Parts – continued –

4Parts Drawing CB 2...Fig. 2ABHCHDGFE

Strona 20 - Head of the Design Dept

5AEye boltBLock nutCCentering ringDType designation (on name plate or impressed on valve body)EBodyFO-ringGDiscHSpringKey

Strona 21 - For your notes

6Pressure Drop Chart CB 1...Fig. 3V˙w= V˙ ·V˙w= Equivalent water volume flowin [l/s] or [m³/h]ρ = Density of fluid (operating condition)in kg/m³V˙w=

Strona 22

7Pressure Drop Chart CB 2...Fig. 4V˙w= V˙ ·V˙w= Equivalent water volume flowin [l/s] or [m³/h]ρ = Density of fluid (operating condition)in kg/m³V˙w= V

Strona 23

8Important NotesSafety noteThe valve must only be installed by qualified staff.Qualified staff are those persons who - through adequate training in en

Strona 24 - GESTRA AG

9Category IIIIIIIVNominal size DN DN DN DN DNCB 14 50–80 100–200 250–300CB 24 S 50–80 100–200 250–300CB 26 50–100 125–300CB 26 A 50–100 125–300CE mark

Powiązane modele: CB 2

Komentarze do niniejszej Instrukcji

Brak uwag