Strona 1

1Installation Instructions 810375-03Operating Terminal and Display Unit URB 1URB 1

Strona 2 - Contents

10Technical dataType approval no.TÜV · 98-399 (level)TÜV · WÜL · 02-007 (conductivity)InputPower supply: 18 V – 36 V DCInterface for CAN bus using CAN

Strona 3

11 Wire equipment in series. Star-type wiring is not permitted. Interlink screens of control cables such that electrical continuity isensured and co

Strona 4 - Wiring Diagram

12Tools Screwdriver for slotted screws, size 2.5, completely insulated according toVDE 0680Wiring – continued –Note Connect screen only to termina

Strona 5 - Functional Elements

13Basic SettingsCAN-BusAll level and conductivity controllers and associated electrodes are interconnected bymeans of a CAN bus using the CANopen prot

Strona 6

14Basic Settings – continued –Adjusting display brightnessThe brightness of the LCD display can beadjusted as necessary.Press button several tim

Strona 7

15Basic Settings – continued –Adjusting display brightness – continued –Press button several times toincrease the brightness.Press button

Strona 8 - Explanatory Notes

16Basic Settings – continued –Changing factory set node ID of the URB 1 / Adjusting & changing node IDThe factory set node ID of the URB 1 is“060

Strona 9

17Basic Settings – continued –Changing factory set node ID of the URB 1 / Adjusting & changing node ID – continued –Press button briefly to

Strona 10 - Installation

18Basic Settings – continued –Changing factory set node ID of the URB 1 / Adjusting & changing node ID – continued –Press button twice brie

Strona 11 - UNITRONIC

19Basic Settings – continued –Setting /changing node IDs of bus-based equipmentThe standard default node ID setting of allbus devices that can be dis

Strona 12 - Wiring – continued –

2ContentsUsage for the intended purpose ...8Safety note ...

Strona 13 - Basic Settings

20Basic Settings – continued –Setting /changing node IDs of bus-based equipment – continued –Press button once briefly to select thedigit “0”.P

Strona 14 - Basic Settings – continued –

21Basic Settings – continued –Setting /changing node IDs of bus-based equipment – continued –Press button seven times briefly toselect the digi

Strona 15

22Basic Settings – continued –Setting /changing node IDs of bus-based equipment – continued –Press button twice briefly to save thesettings and

Strona 16

23Press button briefly to enter the displaywindow of the level controller NRR 2-40.Actual level (graphical representation)Actual level (percentag

Strona 17

24Basic Settings – continued –Visual display / Parameterisation of bus devices – continued –Press button briefly to enter theparameterisation m

Strona 18

25Basic Settings – continued –Visual display / Parameterisation of bus devices – continued –Press button briefly to enter theparameterisation m

Strona 19

26Press button briefly to enter the errormessages window.For more information refer to sectionMalfunction, Troubleshooting, FaultFinding List on

Strona 20

27Press button briefly to enter the displaywindow of the level switch NRS 1-42.HIGH LEVEL switchpointSwitchpointsLOW LEVEL switchpointPress butto

Strona 21

28Basic Settings – continued –Visual display / Parameterisation of bus devices – continued –Press button briefly to enter the errormessages win

Strona 22

29Basic Settings – continued –0 % /100 % calibration for capacitance level monitoring systemPress button three times briefly to enterthe window

Strona 23

3Manual operation via external control valve ... 70Stand-by operation with the steam boile

Strona 24

30Basic Settings – continued –0 % /100 % calibration for capacitance level monitoring system – continued –Press button once briefly.Press butto

Strona 25

31Basic Settings – continued –0 % /100 % calibration for capacitance level monitoring system – continued –Press button three times briefly to e

Strona 26

32Basic Settings – continued –Calibrating the feedback potentiometer of an external control valvePress button briefly to activate themanual mode

Strona 27

33Basic Settings – continued –Calibrating the feedback potentiometer of an external control valve – continued –Press and hold down button until

Strona 28

34Basic Settings – continued –Calibrating the feedback potentiometer of an external control valve – continued –Press and hold down button until

Strona 29

35Press button once briefly to return tothe main window.Basic Settings – continued –Calibrating the feedback potentiometer of an external contro

Strona 30

36Basic Settings – continued –Establishing switchpoints and proportional coefficient XpPress button once briefly to activatethe line editing mod

Strona 31

37Basic Settings – continued –Establishing switchpoints and proportional coefficient Xp – continued –Press button once briefly to activate the

Strona 32

38Press button once briefly.In our example switchpoint 1(MAX switchpoint) shall be established at70 %.Basic Settings – continued –Establishing s

Strona 33

39Basic Settings – continued –Establishing switchpoints and proportional coefficient Xp – continued –Press button twice briefly to return toth

Strona 34

4Wiring DiagramFig. 2Fig.1Terminating resistor 120 Ω,Paired cable*) CEP = central earthable pointOperatingterminalURB 1ConductivitycontrollerLRR 1-40C

Strona 35

40Basic Settings – continued –Adjusting sensitivity of responsePress button twice briefly to activatethe line editing mode.Use buttons and

Strona 36

41Basic Settings – continued –Adjusting sensitivity of response – continued –Press button three times briefly to savethe setting and return to

Strona 37

42Basic Settings – continued –Setting relay delay timesPress button once briefly to activatethe line editing mode.Use button or to scr

Strona 38

43Press button once briefly.Press button to move to the next digit inthe same line.Press button once briefly.In our example the digit “

Strona 39

44Press button twice briefly to deactivatethe line editing mode.In our example the relay delay time for theMAX switchpoint of the NRR 2-40 is 2 s

Strona 40

45Basic Settings – continued –Adjusting conductivity controllerPress button twice briefly to activatethe line editing mode.Use button or

Strona 41

46Press button once briefly to deactivatethe line editing mode.All conductivity values metered will now beindicated in [ppm].Press button on

Strona 42

47Press button once briefly to deactivatethe line editing mode.Press button once briefly to enter theline where the conductivity setpoint of

Strona 43

48Press button twice briefly to select thedigit “3”.Press button five times briefly.In our example a conductivity setpoint of3000 µS/cm has

Strona 44

49Press button once briefly to deactivatethe line editing mode.Press button once briefly to enter theparameterisation window for the followi

Strona 45

5Functional ElementsFig. 31 2 3 456

Strona 46

50Press button twice briefly to select thedigit “2”.Press button twice briefly.In our example the proportional band Xpwas set to 20 %.Press

Strona 47

51Press button once briefly to enter theline where the operating position of thecontinuous blowdown valve can bechanged.Press button once br

Strona 48

52Basic Settings – continued –Adjusting conductivity controller – continued –flashingPress button once briefly.In this line you can establish th

Strona 49

53Basic Settings – continued –Adjusting conductivity controller – continued –Press button once briefly to activate the100% adjustment position.

Strona 50

54Press button once to activate the lineselection mode.Press button four times briefly.In this line you can decide whether you wantto use re

Strona 51

55Press button once briefly to activate the lineediting mode.Basic Settings – continued –Adjusting conductivity controller – continued –Press b

Strona 52

56Press button once briefly to activate the lineselection mode.The frequency of the intermittent blowdown canbe adjusted in the line editing mode

Strona 53

57Press button twice briefly to accept theconfiguration.Press button once briefly to return tothe main window.Press button once briefly

Strona 54

58Basic Settings – continued –Adjusting LIN (linear) temperature compensationPress button once briefly to activatethe line editing mode.The spli

Strona 55

59Press button once briefly to activate theline editing mode.If the reading of the calibrated conductivitymeter does not tally the value indicate

Strona 56

6Functional ElementsFig. 4ABA7

Strona 57

60Press button once briefly to accept theconfiguration.In our example a gradient of 1.9 % / °C wasadjusted.Press button twice briefly to ret

Strona 58

61Basic Settings – continued –Adjusting NORM (standard curve) temperature compensationPress button twice briefly to activate theline editing mod

Strona 59

62Press button once briefly to activate theline editing mode.In this window the following parameters canbe set: Standard curve temperature compe

Strona 60

63Press button once briefly to selectthe digit “1”.Press button once briefly to accept theconfiguration.The standard curve “01” is now activ

Strona 61

64Press button once briefly to select thefunction “start”.Press button once briefly to finish theconfiguration.Raise temp./ pressure until t

Strona 62

65Press button three times briefly toreturn to the main window.Press button twice briefly to selectthe function “Stop”.The recording of the

Strona 63

66Basic Settings – continued –Enabling AUTO temperature compensationPress button twice briefly to activatethe line editing mode.The split-screen

Strona 64

67Press button once briefly to finish theconfiguration.In our example we have activated an AUTO curvewith 15 temp./conductivity values which has

Strona 65

68Basic Settings – continued –Disabling temperature compensationPress button twice briefly to activatethe line editing mode.The split-screen mai

Strona 66

69Press button once briefly to save settings andfinish the configuration.The temperature compensation is now disabled.Press button once brie

Strona 67

7Program button for switching between operating mode and parameterisation modeIncrease buttonDecrease buttonEnter buttonManual / automatic buttonIllum

Strona 68

70OperationManual operation via external control valvePress button briefly to enter the displaywindow of the level controller NRR 2-40.The split-

Strona 69

71Operation – continued –Stand-by operation with the steam boiler disconnectedUse an external switch to enable the stand-bymode of the conductivity c

Strona 70 - Operation

72TroubleshootingThe sources of malfunctions occurring in CAN bus systems operating with several bus-based stations must be analysed systematically si

Strona 71 - Operation – continued –

73The thermal fuse of one of the levelelectrodes has been triggered.Check that the level electrode has beenmounted as specified in the installationman

Strona 72 - System Malfunctions

74The CAN bus communication of acontroller is disrupted.Check that the controller and the levelor conductivity electrode have beenmounted as specified

Strona 73 - 5 times briefly

75AnnexAttention Do not assign the same node ID twice within the CAN bus network.Establishing / changing node IDIf several systems of the same kind a

Strona 74

76Fig. 5 Rear panel of the URB 1Fig. 6 Default factory setting 250 kBit/sAnnex – continued –Baud rateS8S9 S0250 kBit/sCable length125 mOFFONOFFOFF125

Strona 75 - Electrode

77.oNtnegagninoitidnoCC°52ta]mc/Sm[ytivitcudnoccisaB1adoscitsuaC0622adoscitsuaC08013adoscitsuaC00454adoscitsuaC000115etahpsohpmuidosirT0916etahpsohpmu

Strona 76

78Annex – continued –Declaration of conformity Fixing screw for panel mountingKeyWe hereby declare that the equipment URB 1 conforms to the following

Strona 77 - Annex – continued –

79Example of InstallationFig. 7959563A

Strona 78

8The URB 1 is a user-friendly operating terminal and display unit for GESTRA CANbus systems using the CANopen protocol. The equipment makes retrieving

Strona 79 - Example of Installation

80810375-03/304 · © 2002 GESTRA GmbH · Bremen · Printed in GermanyGESTRA GmbHPostfach 10 54 60, D-28054 Bremen, Münchener Str. 77, D-28215 BremenT

Strona 80 - GESTRA GmbH

9FunctionExplanatory Notes – continued –System description – continued –The URB 1 communicates with other GESTRA system components via a designatedC